فقدت بيانات الدخول؟   تسجيل جديد  
A A A
السلام عليكم , ..زائرنا الكريم._.للمشاركه في المنتدي ينبغي عليك التسجيل ..اولا
اسم المستخدم: كلمة المرور: تذكرني
  • صفحة:
  • 1

الموضوع:

مهندس مدني خبره للعمل كمدير مشاريع او لادارة شركة مقاولات 30/11/2014 على 02:49 #1

Curriculum Vitae
Personal Information

Name: Mohamed Talha morsi Hassan
Birth Date: 14 Feb 1978
Married Status: Married- 1 Children
Nationality: Egyption

Education
Degree: Bachelors Degree in Civil Engineering
Graduation Year: 2003
University: Al-Azhar University
Location : Cairo – Egypt - Nasr City


Career Objective

A focused and enthusiastic individual, with a target driven attitude to succeed.
Analytical skills: Developed through research work for final year project as well, as through
Modules in estimation and costing.

Communication: Oral communication skills developed through liaison with, customers and
Colleagues while studies and employment.

Organization : Able to manage my time effectively to undertake my job, allotted. Capable of
Working under pressure at busy periods.

Experience:


Managing all sent and received correspondences, supervision for construction buildings and roads

Management and coordination, planning, Procurement, cost estimate and control, supervision

Contract administration and construction Management, Planning, Scheduling, Time Schedule,

Monitoring and Review Daily, weekly and Monthly reports, Payments Release for Contractors, cost

Control, cost estimated Change orders and Claims, Study Projects & Evaluating & Analyzing

Tenders.


Jul 2011 to Feb 2014: Fajr Construction Co., KSA, Multiple projects (Billion SR)

Position: Projects Manager.

Managing all sent and received correspondences, Management and coordination, planning,

Procurement, cost estimate and control, supervision, Contract administration and

Construction management, Planning, Scheduling, Time Schedule, Monitoring and Review

Daily, weekly and monthly reports, Payments Release for Contractors, Change orders and

claims, Study Projects & Evaluating & Analyzing Tenders.

Jun 2010 to Jun 2011: Hosny Consulting Engineer , Egypt

Position: Senior Planning Engineer "Cairo &Alexandria Stock Exchange B 135 in Smart Village"

(Total Budget 163 million EGP).
Responsibility:-

* Managing meeting minutes, daily and monthly reports.
* Preparing monitoring and progress reports.
* Managing project drawings, shop drawings and submittals.
* Managing Purchase orders and materials delivery.
* Managing Invoices, variation orders and change orders.
* Managing Technical letters.
* Ensure all project requirements & objectives are properly documented Establish
& confirm guidelines applicability to the project.
* Responsible for all Global and Administration data within P6
* Assisting in preparing time schedule and reviewing existing schedules
* submitted from the contractors.
* Preparing Cash flow curves and Earned value reports.
* Updating the time schedule & resources allocation.
* Prepare the material delivery plan.
* Preparing submittals schedules.
* Review Work shop Drawing.
* Prepare Daily, weekly and monthly reports.
* Follow-up Execution.
* Payments.


Feb 2008 to Jun 2010: Alzahraa Company, EGYPT

Worked as Project Manager for the construction," superstructure On Macaroni

Factory in Badr City" Consists administration building, 6 storage silos, Fluor mill, Ancillary

Buildings Construction management. Contract administration and Construction management,

Planning, Scheduling, time and cost Control. (179 Million EGP ) .

Jan 2007 to Feb 2008: E C G Engineering Consultants group , Egypt

Position: senior Site consultant Engineer ( Roads – buildings )

Worked as supervisor engineer for projects With ( E C G Engineering Consultants Group Egypt)

Execution of Madinaty Town consists of at

: Roads –Landscape & 1105: 280 building consists of 7 floors & Villas with Swimming Pool

: Administration Building & Social Building & Golf area & Swimming Pool Building.

Jan 2005 to Jan 2007 Top Design Company, Doha Qatar

Worked as Site Engineer for the Finishes and decoration for Doha Marriott Hotel

Consists of five buildings each building 54 floors. Contract administration

And Construction management, Planning, Scheduling, time and cost Control.

2003 to April 2005 Al Mehthel Trading & Contracting Co , KSA

Position: Site Road Engineer

Worked as Site Engineer for the construction of the Interior Road and The Main Road

( Al Sifah – Al Bayad – Al urf – Al kaida ) Road which belongs to Transportation Ministry

at Saudi Arabia with The consultant of the project is Saudi TEch Consultant.

Responsibilities:

Project Estimation Phase:
• Conduct bid/tender conceptual estimation.
• Review bid/tender drawings
• Build bid/tender specifications submittal , BOQ, and formulate the tender proposal.
• Estimate the bid/tender cost.
• Assign contingency and markup percentages.
• Conduct sensitivity analysis.
• Run what if analysis and value engineering

Project Planning Phase:
• Preparations of schedule data for proposals or contracts
• Initiate the project work breakdown structure (WBS) and deploy it a base of estimation, construction, planning, invoicing…etc.
• Determines schedule dates for work activities & determines milestones to support project schedules.
• Establish work sequence and activity durations & identify constraints and the critical path.
• Assign quantity and manpower resource loading.
• Provide schedule knowledge on a continuous basis to assist in discipline planning and interfacing with others.
• Perform schedule monitoring, including identifying critical activities.
• Assist in the development of the project code of account.
Assist in developing work-off rates and installation curves.
• Evaluates subcontractor schedules.
• Liaise with all project team to insure proper understanding and running of project plan.
• Release s-curve for all project phase to set one of the most project metrics.
• Generate cash flow, resources, material & equipment histograms and curves which present the project demand curves.
• Release project critical path & critical chain activities and discuss it with project management to draw all attention on these areas.
• Conduct project sensitivity analysis using regression & statistical analysis to determine the impact of resource availability and probability of project completion.
• Set contingency plan, risk analysis and risk assessment by using pert and decision tree method, the objective is to determine the auxiliary actions to be taken in case of unexpected developments or accident in the project.
• Using schedule compression techniques (in case of rush projects) to obtain the optimum project plan, which fulfill the new contract terms and schedule.
• Reinforcement of the importance of achieving cost and schedule goals; as well as quality.






Project Cost Control (Manpower, Equipment and Material Management):
• Assists in the preparations of cost data for contracts.
• Identifies and monitor “Baseline Budget”.
• Verifies and monitor quantities.
• Assign and apply installation rates to contract quantities if required.
• Assists in the development of requirements for cost recording, reporting and analyzing standards, programs, reports and in their implementation.
• Establish specific project codes of account and assist in developing a Work Breakdown Structure.
• Prepares and develops study information as assigned: Evaluates quantities, job-hours/staffing for a
• specific discipline or specialty. Collects and classifies cost engineering, procurement and construction data and performs data analysis and development.
• Prepares quantity progress and performance reports for assigned disciplines or specialties if required.
Establish Trend and deviation Program.
• Verify variation orders and change orders.
• Monitor project cost by using Earned Value Management (EV), Earned Schedule Management (ES), Cost Performance Index (CPI) & project balance techniques, and report the periodical financial statement, in addition to monitor and budget deviations.
• Use Activity Based Costing (ABC) as a concurrent method to monitor the performed work cost and to analyze breakdown cost for all project activities.
• Use Activity Based costing (ABC) as a superior method to estimate the labor/equipment productivity, which is very important to measure the project performance, and use these data for future estimation.
• Implement Performance Indicator for project disciplines as an evaluation indicator.
• Review progress invoicing to assure proper progress payment according to project financial plan.

Project Deliverables & Reports:
• Issue project controls variance reports that highlight conformance or non-conformance with standard project control expectations.
• Audits project progress and reports inconsistencies with project progress reporting processes and reality.
• Supervise daily, weekly and monthly reports production, and submit it for consultant, client and multi project management office and any other stakeholders.
• Supervise updating of master plan from site and other dept. feedback as reply on 4 weeks "look ahead" plan.
• Ascertain the engineering deliverables and update the progress in the master plan.

Project Resources Control:
• A train project management resources in the use of project control tools and techniques and develops Competency assessments for these resources in the project controls area.
• Monitor any resource deviation, and report the resource utilization, effectiveness, and efficiencies.

Subcontractor Performance Control & Monitoring:
• Establishing scope matrix to insure complete coverage for project scope of work.
• Review all subcontractor plans to insure full compliance with project master plan.
• Monitor and evaluate the progress and performance of project’s sub-contractors to insure proper overall progress. And analysis subcontractor delay and impact claims to minimize additional owner expenses

Training Courses

1- Planning:

A- Primavera Version 6.v8.2
B- Primavera Risk Analysis.
C- Primavera contract manager.
D- Primavera cost control.
E- Preparation for Project Management professional Exam (PMP).

2- Computer Skills.

A- Microsoft Office 2010 & Microsoft XP.
B- AutoCAD 2010 & Photoshop.
C- Autodesk Naviswork.

Languages:

• Arabic: mother language.
• English: Good in reading, writing and speaking.

Contact Information:

E-mail: , Mobile: 00201017124411 / 00201148478609

Note: In Case of My Mobile is Unreachable, Please contact me using personal e-mail ( )
  • مهندس عقار
  • مهندس عقار's الصورة الرمزية كاتب الموضوع
  • غير متصل
  • COM_KUNENA_SAMPLEDATA_RANK1
  • مشاركات: 22
  • تلقي الشكر 4

الرجاء قم بــتسجيل الدخول أو إنشاء حساب.. للإنضمام للمحادثة.

  • صفحة:
  • 1