Sinohydro Co. Ltd. hereby invites the international qualified subcontractor to quote for the following work inside Sinohydro complex.
The scope of work involves the Engineering, Procurement and Construction (EPC) of Swimming Pool for Yanbu University Men's Campus. Subcontractor shall prepare the shop drawing, carry out the calculation, supply any materials and Plants/Equipment complete test and commission, hand over Swimming Pool for Building P as per Specifications, Drawings and to final approval of Main Contractor and the Employer. The work involves, including but not limited to, mechanical, electrical which shall consists of Disconnect Switch, Cable Tray, Swimming Pool Control System, Control Cable, and Plumbing with all of the necessary accessories of the Swimming Pool System as per the Main Contract specification required.
You may contact with Engr. Mr. Zhang for further information.
Email: